Skip to content
itsorted.online
Industry guide

Signage and Outdoor Ad Contractors: Approvals and Quote Forms

Customers buying a shop sign or outdoor advertisement usually do not know it needs a licence, and they find out when a contractor mentions it, or when BCA does. A signage company's website can win trust by explaining the approvals clearly and collecting the right details up front: location, photos, dimensions and who owns the wall. This guide sets out the current rules from BCA's and URA's own pages, what to say about them on your site without overpromising, and how to build a quote form that saves site visits.

By IT Sorted teamReviewed 8 min readHow we write guides
in

Key takeaways

  • BCA licenses outdoor advertising signs and signboards through its online Advertisement Licensing System (ALS).
  • Each business premises can claim a one-time aggregate 5 m² signboard exemption, per BCA.
  • BCA typically takes 7 working days; cases needing URA evaluation can take about two weeks more.
  • Signs over 10 m² on a structure, or structures 4 m or taller, need a Permit To Use via a Professional Engineer.
  • In conservation areas URA controls sign size and position, and traditional signs must be kept.
In this guide · 8 sections
  1. 01Which signs need a BCA licence
  2. 02The 5 m² exemption, fees and Permit To Use
  3. 03Application steps and documents customers must provide
  4. 04URA rules for conservation areas and the Central Area
  5. 05What to say on your website
  6. 06A quote form that saves site visits
  7. 07Do it yourself or get help?
  8. 08Frequently asked questions

Short answer

Outdoor advertising signs and signboards in Singapore generally need a BCA licence, applied for through BCA's online system. Signboards totalling up to 5 m² per premises can be exempt, larger structures may need a Permit To Use from a Professional Engineer, and URA has extra rules in conservation areas.

Which signs need a BCA licence

BCA's outdoor advertising sign and signboard licence page, last updated 14 October 2026, says you need a licence if you display an outdoor advertising sign or signboard. "Outdoor" includes roofed spaces that are not fully enclosed and are open to the public.

Sign typeWhat BCA meansLicence?
SignboardNames the place or business it is fixed to, with no other brand promotedYes, unless within the 5 m² exemption
Advertising signPromotes goods, products, brands, services or eventsYes
Free-standing signSign on a structure that stands on its ownYes
Directional signDirects traffic or people to a placeYes
Animated billboardMoving pictures or changing coloursYes, with restrictions
Signs at hawker stalls, underpasses, MRT stationsListed exemptionsNo
Source: BCA outdoor advertising sign and signboard licence page, checked 20 Oct 2026

BCA also lists prohibited outdoor signs, including flashing or running lights outside specific parts of Orchard Road, Bras Basah/Bugis and Chinatown, advertising signs on residential buildings, signs above roof level, and signs on public streets, infrastructure or vacant land. Mentioning this on your site saves time with customers who ask for something that cannot be approved.

The 5 m² exemption, fees and Permit To Use

BCA's supporting information page explains the exemption, fees and when an engineer is needed.

  • Signboards totalling up to 5 m² per premisesOne-time aggregate exemption; declaration form requiredExempt
  • Signboard licence, up to 15 m²S$50 per year
  • Advertisement or directional sign, up to 1 m²S$20 per sign per year
  • Advertisement, above 1 m² to 5 m²S$90 per sign per year
  • Advertisement, above 5 m² to 10 m²S$140 per sign per year
  • Animated billboard, up to 10 m²S$225 per sign per year

BCA licence fees as listed in October 2026. Minimum chargeable period one month, minimum fee S$20. GIRO is required for annual auto-renewal.

A Permit To Use is required before the licence is granted if the sign exceeds 10 m² and is supported by an advertising structure, or if the structure exceeds 10 m² or its highest point is 4 metres or more above the surface it stands on. A Professional Engineer applies for it through CORENET e-Submission, and it must cover the whole display period.

Application steps and documents customers must provide

Many of the documents BCA needs come from the customer or their landlord. Explaining this early avoids delays after the sign is made.

  1. Log in to the Advertisement Licensing System (ALS)

    With Singpass, and submit the proposal for BCA evaluation.

  2. Prepare drawings

    Visual of the sign with the licence number position, elevation with dimensions, fixing section and materials, layout plan and site plan.

  3. Get owner and management consents

    Written consent and endorsement from the building owner, landlord, MCST or Town Council, depending on the property.

  4. Apply for Permit To Use if needed

    Through a Professional Engineer on CORENET for larger signs or tall structures.

  5. Pay the licence fee

    The licence is emailed after payment. BCA typically takes 7 working days if all documents are in; URA evaluation can add about two weeks.

BCA notes that no changes are allowed during the formal application stage, so finalise the design with the customer before submitting.

URA rules for conservation areas and the Central Area

URA's guidelines for signs in conservation areas control where and how big business signs can be on conserved shophouses. Signs must not cover key architectural features, traditional signs that have acquired significance must be kept, and the original building date on the facade cannot be removed.

  • Shopfront signs are mounted within the transom panel; on residential fronts, above the door and no wider than it.
  • Five-foot way signs hang between the column and party wall with at least 2,500 mm headroom.
  • Tenant business signs can include small advertisements, up to one-third of each sign's content.
  • Separate URA guidelines govern outdoor signs in the Central Area.

If your customers are often in Chinatown, Kampong Glam, Little India or other conserved districts, a short page on your site explaining these limits helps them choose a design that will be approved.

What to say on your website

Customers want to know you understand the approvals and will not leave them with a sign they cannot display. Say what you do, and be careful about what you promise.

Good wording

  • "We prepare drawings and submit your BCA sign licence through ALS"
  • "Signs over 10 m² on a structure need a Professional Engineer's Permit To Use; we arrange this"
  • "Conservation area? We design to URA's signage guidelines"
  • Typical timelines quoted as BCA's "typically 7 working days", with the URA caveat

Avoid

  • "Approval guaranteed"
  • "No licence needed" without checking size and location
  • Fixed approval dates you cannot control
  • Claims of special relationships with agencies

Also show your company details, the kinds of signs you make, photos of completed work you are allowed to show, and your workmanship warranty. Our guides for construction company websites and renovation contractor websites cover how other building trades present licences and gradings.

A quote form that saves site visits

A good quote form collects what you need to price the sign and judge whether it needs a licence or engineer, before anyone travels to site.

Signage quote form fields

Use conditional questions so customers only see what applies, and send each enquiry to your estimator with the photos attached. Ask for consent to use photos only for quoting, and say so in your privacy notice.

Do it yourself or get help?

A simple site with your services, past work and a contact form can be built with any website builder. A quote form with photo uploads, conditional questions and automatic routing to estimators is where a properly built site pays for itself.

Our Business Website (S$1,490) builds a company site with service pages, an approvals explainer and a quote form that collects photos and dimensions. IT Sorted is a Singapore-based team of developers with over 10 years of experience. You pay upfront, send your brief through the site chat or contact form, and track progress on your order page.

Frequently asked questions

Usually, if it is outdoors or in a publicly accessible covered space. BCA requires a licence for outdoor advertising signs and signboards, but each business premises can claim a one-time aggregate exemption for signboards totalling up to 5 square metres. Signs at hawker stalls, in underpasses and MRT stations are among the listed exemptions.

BCA says it typically takes 7 working days to assess an application if all required documents are provided. If the proposal needs evaluation by URA, it may take about two more weeks. Larger signs that need a Permit To Use from a Professional Engineer take longer, because the permit must be obtained before the licence is granted.

As of October 2026, BCA lists a signboard licence up to 15 square metres at S$50 a year, small advertisements up to 1 square metre at S$20 per sign a year, and advertisements above 1 to 5 square metres at S$90 per sign a year. The first 5 square metres of signboards per premises can be exempt.

BCA requires a Permit To Use before licensing if the sign exceeds 10 square metres and is supported by an advertising structure, or if the structure itself exceeds 10 square metres or stands 4 metres or more above the surface. A Professional Engineer applies through CORENET e-Submission, and the permit must cover the whole display period.

Yes. URA's conservation signage guidelines control the position and size of business signs, require significant traditional signs to be kept, and forbid removing the original building date. Signs must not block key architectural features, and five-foot way signs need at least 2,500 mm headroom. Tenant signs can include small advertisements up to one-third of the content.

Rather have it done for you?

Fixed price, set up in your own accounts.

Order online, get a written scope, and keep full ownership of everything we set up. Questions first? Ask us in writing.